Rail Projects

Auch Viaduct

Project sector Rail
Project name Auch Viaduct
Project summary Removal and replacement of walkways
Client name Carillion
Project date Aug-08
Project duration 4 weeks

The contract involved the removal and disposal of the existing timber walkways.

The exposed crossbeams were cleaned and a protective coating applied. New GRP panels were, then, fixed into position.

Timber edging strips were fixed along the top of the deck timber to seal the waterproofing and hold it in place.

  

Auch Viaduct is a seven-span viaduct, with a curvature resembling a horseshoe.