Rail Projects

Ardrossan Access Steps

Project sector Rail
Project name Adrossan Access Stairs
Project summary Improvement of existing access routes
Client name Babcock Rail
Project date Jul-11

A new set of timber stairs was constructed and built on site. The stairs were measured up and built during the day. The works were carried out ‘Separated Green Zone’.

The last section of stairs at track level was installed on a Saturday nightshift, in line with Rules of the Route possession.

  

The works consisted of the removal of the existing access arrangement and the clearance of the area.